Guide

Intent Map

Why each piece of work exists: objectives on the left, then the requirements that refine them, the stories and tasks that build them, and the tests that check them.

For: Founder, Product owner, Project lead, Solo builder

How to read it

ColumnWhat is thereLinked by
Objectives, Business, StakeholderWhy: the outcome and the needsA requirement refines the one above it
Solution, TechnicalWhat is built: functional, non-functional, project and technical requirementsRefines; a technical requirement realizes a solution requirement
WorkStories and tasksThey implement a requirement or cover one of its criteria
TestsTest cases with their last resultThey verify a criterion; shown under the work that covers the same criterion

Click a box to bring its branch forward — everything above and below it. Hide the rest leaves only that branch. Open goes to the record, work item or test.

Filters

  • Find: a code or words from a title; each match stays with its whole branch.
  • Objective: only the branch of one objective.
  • Authority / Approved / Draft: which records to show; work and tests follow their records.
  • Columns: turn a column off, for example Stakeholder or Tests, to make the map narrower.
  • Hide done work: leave out stories and tasks that are done.

The gap counts follow the filters. Clear filters brings everything back.

Gaps

GapMeaning
No parentNothing above says why it exists: it refines no objective or requirement.
Not broken downAn objective or business requirement with nothing below it.
No workA requirement to build that no story or task implements or covers.
No testA requirement with acceptance criteria that no test case verifies.

Choose a gap at the top to light every box with it and the branch it hangs from. Retired records and cancelled work are left out.